Working With National Engineering Services Pakistan (Pvt.) Limited As site Electrical Engineer at

EHV substations since January, 2009 to present

 

(1)  500/220/132KV AIS GAKKHAR Substation

              (January, 2009-July, 2009)

             Responsibilities:-

                                          As Electrical Engineer Supervised All The Electrical Works  From Testing And Commissioning Of 500/220/132 Kv AIS Substation Till Successful Energization Of Substation Including

 

Ø  All individual tests of AIS H.V equipment including

·         power transformer

·         current transformer

·         voltage transformer

·         circuit breaker

·         Disconector switch

·         surge arrestor

Ø  verification of CT & PT circuits through primary and secondary injection

Ø  stability of bus bar protection by verification of stable and unstable conditions

Ø  Interlocking of circuit breaker, disconnecting/earthling switch

 

 

Ø  control panel including

·         alarm annunciations

·         testing of ammeter, voltmeter, active power and reactive power reading

Ø  dc battery discharge test

Ø  testing of energy meters

Ø  synchro-check scheme

·         testing of synchronizing parameters, synchronizing conditions, synchronizing schemes

Ø  testing and commissioning of protection relays and their  respective schemes including

·         distance protection scheme

·         auto-reclouser scheme

·         trip circuit supervision scheme

·         circuit breaker failure scheme

·         500/220kv,220kv/132kv autotransformers protection schemes

·         Testing of sergi fire protection for autotransformers

Ø  verification of contractor’s monthly invoices according to actual work done at site

Ø  Preparation of punch list works and their rectification at site

Ø  Office works regarding preparation of daily progress reports, site instructions etc.

 

(2)   Extension Works at MANGLA Power House Switch Yard 220/132 KV Substation

            (August, 2009 – October, 2010)   

 

              Responsibilities:-

                                           As Site  Engineer Responsible For  Supervision Of Civil Works Installation,   

             Erection, Testing And Commissioning Of Extension Works Including

 

Ø  Erection of beam, high and low level gantries.

Ø  Installation of bus bars, stringing of gantry spans.

Ø  Out door testing of all HV equipments.

Ø  Characteristic and functional tests of transformer protection relay panels R3 & R4.

Ø  Verification of CT & PT circuits.

Ø  Testing and commissioning of 220/132kv, 138MVA autotransformer and its energization.

Ø  Dismantling of existing control panel of Gakkhar-2 line, installation of new control panel.

Ø  Laying and termination of control cables from power hose and relay room to switchyard.

Ø  Civil works regarding foundation and concrete works of high and low level gantries, cable trenches.

Ø  verification of contractor’s monthly invoices according to actual work done at site

Ø  Preparation of punch list works and their rectification at site.

Ø  Office works regarding preparation of daily progress reports, site instructions etc

 

(3)  Extension Works at 220KV BURHAN Grid Station and 500KV New REWAT Substation

(November, 2010 – May, 2011)

             Responsibilities:-

                                                    As Site  Engineer Responsible For  Supervision Of Civil Works Installation, Erection, Testing And Commissioning Of Extension Works Including

 

Ø  Strengthening of existing foundation of 220/132kv, 160MVA autotransformer to bear a load of 220/132kv, 250MVA autotransformer at 500kv new Rewat substation.

Ø  Dismantling of existing 220/132kv, 160MVA autotransformer and installation of new 220/132kv, 250MVA autotransformer at 500kv new Rewat substation.

 

 

Ø  Testing and commissioning new 220/132kv, 250MVA autotransformer at 500kv new Rewat substation and its energization on load.

Ø  Civil works at site regarding foundation of 220/132kv 160MVA autotransformer, circuit breakers, CT’s, CVT’s, Disconector switches foundations at 220kv Burhan grid station

Ø  Installation of 220/132kv, 160MVA autotransformer along with its interfacing with existing breaker and a half scheme Bay at 220kv Burhan grid station

Ø  verification of contractor’s monthly invoices according to actual work done at site

Ø  Office works regarding preparation of daily progress reports, site instructions etc.

 

(4)  Extension Works at TARBELLA Power House Switch Yard 500/220KV Substation

(May, 2011 – to date)

                    

           Responsibilities:-

                                               As Site  Electrical Engineer Responsible For  Supervision Of

 

Ø  Testing and commissioning of 500/220kv autotransformer bank

Ø  Testing of sergi fire protection for 500/220kvautotransformerbank

Ø  Individual and functional test of circuit breakers, current transformers, voltage transformers, disconector switches

Ø  Interfacing of 500kv bus bar and breaker failure schemes with existing substation scheme

Ø  Verification of current and voltage circuits

Ø  Testing of trip circuit supervision scheme

Ø  control panel including

·         alarm annunciations

·         testing of ammeter, voltmeter, active power and reactive power reading

Ø  verification of contractor’s monthly invoices according to actual work done at site

Ø  Preparation of punch list works and their rectification at site

Ø  Office works regarding preparation of daily progress reports, site instructions etc.

Educational Qualifications:

2004 to 2008

BSC Electrical Engineering - “Specialization in Power”

University of Engineering and Technology, Lahore.

2001 to 2003

Higher Secondary School Certificate Session

Wensam college D.I.KHAN.

2000 to 2001

Secondary School Certificate Session

Saint Helen’s high school D.I.KHAN.

Skills:

MY BASIC STRENGTH

 

§  Extensive knowledge and experience of  EHV Substations Testing and commissioning  

§  Experience of extension works and their interfacing  in EHV substations

§  Extensive knowledge of control and protection schemes of EHV Substations

§  Good understanding of schematic drawing

Short Term Trainings:

Project planning and scheduling using Ms project & primavera software tools (April, 2011)

                              (Skill Development Council, ISLAMABAD)

Professional Memberships:

Member Pakistan Engineering Council

Registration Number:  ELECT/ 25705

References:

 

  1.  Mr. Shabbir Ahmed Sadiq

Genral Manager EHV Substation,

Power and Mechanical Division,

National Engineering Services Pakistan (Pvt.) Limited.

Email Address:  sadiqsa@hotmail.com

 

  1. Mr. Asad Ur Rehman

 

Project Manager EHV Substations

SIEMENS Pakistan (Pvt.) Limited

 

Email Address: asadur.rehman@siemens.com

Target Job Category:
  Consulting   Government
Contact Info
Contact Name: khan
Address: substation section, P & M division, NESPAK house, 1-c, block-n, modle town extension lahore
Phone: 923314886248
Contact this Job Seeker:

Please enter the text shown in the image in the box below.
The possible characters are letters from a to h in lower case
and the numbers from 1 to 9.